Management of Change in Process Safety

MOC

DURATION: 30 Hours
TRAINING MODE: Online

In Process Industries where any product is produced regularly or in batches the process becomes very critical and for safe operations at each stage the concept of Process safety management (PSM) has come up. So management of change(MOC) program is one of the prominent elements of the PSMwhich is used to ensure all changes to a process are properly reviewed and any hazards introduced by the change are identified, analysed, and controlled before resuming operation.

Course Duration:  30 Hours.

Assessment Method: (100 marks)

  • 10 multiple choice questions (2 marks each)
  • 5 subjective questions (6 marks each)
  • 1 project, to fill up the MOC form based upon a Scenario (50 marks)

MOC in Process Safety Course through Green World Group

The MOC in process safety – 30 hour online program is designed to understand the ideal process of change management, any small change in process can have effect on many other elements of process either directly or indirectly. Our course is directly highlighting the practical challenges in the implementation of MOC program. This MOC program is applicable to any type of process in the industry although some changes can be done as per the company requirement and policy.

Some of the topics include and not limited to:

  • What is Management of Change
  • When MOC should be used
  • Benefits of MOC
  • How to effectively design and implement MOC program
  • Case Studies (failure of MOC and consequences)
  • Type of Changes in Process
  • Process Of MOC
  • MOC Implementation Issues.

Learning Outcomes:

At the conclusion of this program, the student will be able to:

  • Understand the requirement of management of change, in organization.
  • How to identify the type of changes in process for the betterment of organization & employees.
  • Know the process of Management of change and how to make this program effective.
  • Find the impact of a change even a small change in the process.
  • Do the risk based evaluation for every change.
  • Fill the MOC form which is used in industries to carry out this MOC process.
  • Know the responsibilities of every individual of the plant from initiation to closure of the change.